MAQIM Nave II
The challenge: Design, Engineering, and Construction for a new production plant conceived with a focus on efficiency, notable for its absence of central columns, providing an optimal distribution of space and allowing exceptional flexibility.
Notable for its absence of central columns, this feature is key as it provides optimal space distribution and allows exceptional flexibility in the design and layout of machinery, production lines, and work areas.
The plant has been conceived with a focus on energy efficiency and sustainability, integrating daylighting systems, adequate ventilation, and renewable energy technologies, making it a valuable asset to optimize manufacturing operations.