Building T ITESO

The challenge: Intervening in the building T within the ITESO campus during the summer to modernize its 25 classrooms and 3 bathrooms.

Engineering and construction were carried out for the remodeling of the 25 classrooms and 3 restrooms within the building.

The project aimed to provide the spaces with a variety of layouts to accommodate the evolving needs of teaching and collaborative learning.